Question : Export Project Tasks assigned to a single individual
I want to export the tasks assigned to a single individual to a separate Excel file. Out of my very large project, I want to filter on the tasks assigned to an individual and then Export ONLY those tasks shown by the filter to an Excel file.
I already have my export map saved, but none of the filters in the Save map allow me to filter by tasks assigned to a single resource name.
How do I do this? (preferably how do I do it in code...but I can record a macro if shown how to do it in the GUI)
Answer : Export Project Tasks assigned to a single individual
You either need a Handles BTNCheckPrevious.Command at the end of the sub, or an OnCommand="BTNCheckPreviou
s_Command"
in the HTML. Since this is not a top-level command, I would go with the OnCommand in the HTML.
Random Solutions
Active Directory User
Entourage HTML reply format
How do you create a manual SOAP request to a web service in C#?
Creating a new Array and Logical Drive
Is there a way to format an external drive so Linux and Windwos 7 can see it?
Citrix XenApp 5 Installation General Question
how do I conditionally format number in query result to show red if negative
In between Asterisk BLF
Anyone run an online backup software along side Ghost with no conflicts.
assignment format.