Question : Export Project Tasks assigned to a single individual
I want to export the tasks assigned to a single individual to a separate Excel file. Out of my very large project, I want to filter on the tasks assigned to an individual and then Export ONLY those tasks shown by the filter to an Excel file.
I already have my export map saved, but none of the filters in the Save map allow me to filter by tasks assigned to a single resource name.
How do I do this? (preferably how do I do it in code...but I can record a macro if shown how to do it in the GUI)
Answer : Export Project Tasks assigned to a single individual
You either need a Handles BTNCheckPrevious.Command at the end of the sub, or an OnCommand="BTNCheckPreviou
s_Command"
in the HTML. Since this is not a top-level command, I would go with the OnCommand in the HTML.
Random Solutions
Default Printer Changes using Terminal Server
Update HP onboard administrator SSH version?
Getting round-robin load balancing working with vSphere 4.0 cluster on EqualLogic PS4000X
Computing next id in base 36
Flag duplicate record
ORA: 6533 Subscript out of range
Office 2010 KMS on non-AD DNS?
Crystal Reports to Accept Parameters Then Display Reports Accordingly
Windows 2003 Server Event 244
Access / how many users connected?