Question : Export Project Tasks assigned to a single individual
I want to export the tasks assigned to a single individual to a separate Excel file. Out of my very large project, I want to filter on the tasks assigned to an individual and then Export ONLY those tasks shown by the filter to an Excel file.
I already have my export map saved, but none of the filters in the Save map allow me to filter by tasks assigned to a single resource name.
How do I do this? (preferably how do I do it in code...but I can record a macro if shown how to do it in the GUI)
Answer : Export Project Tasks assigned to a single individual
You either need a Handles BTNCheckPrevious.Command at the end of the sub, or an OnCommand="BTNCheckPreviou
s_Command"
in the HTML. Since this is not a top-level command, I would go with the OnCommand in the HTML.
Random Solutions
Sharepoint 2010 Advice, WSS vs MOSS
How do I add my read-only attribute back with a .vb script
Install IIS with a vbs script.If supporting files needed pick from a predefined path.
Exchange 2003 and 2010 coexistent - Outlook in 2010 cannot email to 2003
Can I force reconciliation of old email after blackberry enterprise activation?
Password Protect Back End of an Access Database
Office 2010 pro plus deployment via GPO
Crystal Reports - Load report failed.
Assign the value to a script global variable from the Server side code
Get Current selected link - apply css