Microsoft
Software
Hardware
Network
Question : Export Project Tasks assigned to a single individual
I want to export the tasks assigned to a single individual to a separate Excel file. Out of my very large project, I want to filter on the tasks assigned to an individual and then Export ONLY those tasks shown by the filter to an Excel file.
I already have my export map saved, but none of the filters in the Save map allow me to filter by tasks assigned to a single resource name.
How do I do this? (preferably how do I do it in code...but I can record a macro if shown how to do it in the GUI)
Answer : Export Project Tasks assigned to a single individual
You either need a Handles BTNCheckPrevious.Command at the end of the sub, or an OnCommand="BTNCheckPreviou
s_Command"
in the HTML. Since this is not a top-level command, I would go with the OnCommand in the HTML.
Random Solutions
Sharepoint Webpart page load event issue
XY Chart Label feature
Intel Sata RAID controller on RHEL 4 problem
How do I get this PHP IMAP script to fetch the body of emails? I can't get it to work.
Small Business mathematics
Reverse DNS does not match SMTP Banner
Javascript to get <TD> inner text in MSIE, FF and Chrome
Out of Office Assistant not working w/Forwarding Configured
Intermittent internet connectivity for PCs in small remote office
Strip out ’s in mySQL query | XML Parsing Error: undefined entity