Question : Export Project Tasks assigned to a single individual
I want to export the tasks assigned to a single individual to a separate Excel file. Out of my very large project, I want to filter on the tasks assigned to an individual and then Export ONLY those tasks shown by the filter to an Excel file.
I already have my export map saved, but none of the filters in the Save map allow me to filter by tasks assigned to a single resource name.
How do I do this? (preferably how do I do it in code...but I can record a macro if shown how to do it in the GUI)
Answer : Export Project Tasks assigned to a single individual
You either need a Handles BTNCheckPrevious.Command at the end of the sub, or an OnCommand="BTNCheckPreviou
s_Command"
in the HTML. Since this is not a top-level command, I would go with the OnCommand in the HTML.
Random Solutions
dateDiff - combining a date selection and a time selection
How does the pointers of an inode's data block relattes to the logical block address of a SCSI device?
Converting example Outlook Redemption VBS to C#
Combofix Log - Analysis Assistance Request
SPID process blocking itself
Script needed to close program and stop/start service
Quickbooks 2010 QB crashes when trying to print to network printer
(hopefully) Simple Excel 2007/2010 question
How do I delete a file from a folder (uploads directory) when I delete its reference in the database?
SQL injection problem on several pages. Any server side solution to this